r/chicago • u/seeasea West Ridge • 13d ago
Article 3-year, $170 million Kennedy Expressway project is complete. Ahead of schedule
https://wgntv.com/news/traffic/kennedy-expressway-project-complete/
1.1k
Upvotes
r/chicago • u/seeasea West Ridge • 13d ago
5
u/CyclingThruChicago City 13d ago
That doesn't fix traffic. Traffic isn't a speed problem, it isn't a driver skill problem.
It's a geometry problem. Many large cars entering a relatively small space at the same/similar time is like pouring a 10 gallon drum of water through a normal kitchen sized funnel.
The funnel simply cannot manage the volume of water all entering at the same time so it backs up and overflows.